Phase 2: Infrastructure

Q3 2025 - Q4 2025

Infrastructure Development

Phase 2 focuses on building the essential infrastructure that will support the entire community. This phase ensures that all basic amenities and services are in place before residents begin construction of their homes.

Road Network

  • ✓ 15-meter wide main roads
  • ✓ 10-meter wide secondary roads
  • ✓ Proper drainage systems
  • ✓ Street lighting
  • ✓ Pedestrian walkways

Water and Drainage

  • ✓ Underground water pipes
  • ✓ Central water treatment facility
  • ✓ Stormwater drainage system
  • ✓ Sewage treatment plant

Electrical Infrastructure

  • ✓ Underground power lines
  • ✓ Backup power systems
  • ✓ Solar power integration
  • ✓ Smart grid technology

Plot Allocation

During this phase, we will:

  • ✓ Mark all plot boundaries
  • ✓ Install plot markers
  • ✓ Provide detailed plot documentation
  • ✓ Conduct site inspections
Schedule Site Visit
Phase 2 Overview

Construction Timeline

  • 📅 Road Construction: July - September 2025
  • 📅 Water Systems: August - October 2025
  • 📅 Electrical Works: September - November 2025
  • 📅 Plot Marking: November - December 2025

Track Our Progress

Stay updated with our infrastructure development through regular progress reports and site visits.

Request Progress Report